Welcome: Chengdu Chengjing Gaoke Purification Equipment Co. Ltd.
Language: Chinese ∷  English

Product Information

Discussion on design scheme of air purification project in laboratory animal room of pharmaceutical factory

 DOWNLOAD

Discussion on design scheme of air purification project in laboratory animal room of a pharmaceutical factory

Due to the particularity of its function and the complexity of its use state, laboratory animal room has more attentions and requirements than other cleaning system engineering design. First of all, we should cooperate with the architectural and technological design and communicate with the construction unit to fully understand the environment and service conditions. It provides a good foundation for the design of purification air conditioning system in architectural design and process layout. When determining the air conditioning design scheme, it should first meet the use function of animal room under various working conditions. According to the scientific and reasonable division of air conditioning zones, considering the energy-saving measures and deodorization measures of the air-conditioning system, the air-conditioning pipeline system should not be too complex. For various regulating valves, products with convenient adjustment and reliable operation should be selected, which can effectively improve the stability of the system operation,

CONTACT US

Contact: manager.zhan

Phone: 15928853231

Tel: 028-87849573

Email: 2541565040@qq.com

Add: Chengdu Gaoxin West District Science and Technology Park

Scan the qr codeClose
the qr code